Homes and buildings
Asbestos pipe lagging and insulation removal in Manchester
Old pipe lagging, boiler casings and insulation board are among the higher-risk asbestos materials. Much of this work is licensed, which means a contractor holding an HSE licence has to do it.

Boilers, pipe runs and risers in older Manchester houses, plant rooms and workshops were often wrapped in asbestos-containing insulation. It can be soft and crumble when touched, which is why it is treated as higher risk than asbestos cement.
Work on these materials normally needs a licensed contractor, advance notification to the regulator and a sealed enclosure with air extraction. We pass your enquiry to a contractor with the right licence for the job.
How the job runs
- 1
Identify and survey
The material is sampled and the extent mapped, so the right category of work is clear.
- 2
Notify and plan
Licensed work normally has to be notified to the regulator in advance. A written plan of work is prepared.
- 3
Enclose and remove
A sealed enclosure with air extraction is built and the lagging is removed wet in protective equipment.
- 4
Clear and test
After removal the enclosure is cleaned and checked before it is taken down and the area is released.
What affects the price
- Length and diameter of pipework
- Whether the plant is still live or can be shut down
- Access and working height
- Amount of insulation board or casing
- Notification period and any air testing
Common questions
Does this always need a licence?
Pipe lagging and sprayed insulation are generally licensed work. The contractor confirms the category after seeing the material.
Can I stay in the building?
Usually yes for rooms away from the enclosure, but the contractor sets the exclusion zone and tells you what to expect.